eRG 21 T hybrid

The eRG 21 T hybrid is the hybrid version of our most powerful pile driver with telescopic leader. With a high permissible torque, a long effective length and high tractive forces, this machine is also suitable for pile driving with long piles and for heavy-duty drilling methods.

Information
MR 150 AVM
Max. vibrator size
Information
21.0 m
Max. piling material length
Information
563 kW
Max. engine performance

Methods

Vibration driving

Vibrohammer

Depth vibrator

Slim cut-off wall

Displacement pile

Impact driving

Diesel hammer

Hydraulic hammer

Pressing

Sheet pile press

Drilling

Pre-drilling

Double-head drilling system Cased CFA

CFA drilling

Displacement piling system FDP

DTH down-the-hole hammer

Soil mixing techniques

CSM (Cutter Soil Mixing)

MSM and SCM (Single Column Mixing with MB)

SCM-DH (Single Column Mixing with FoW)

Your partner in all areas

Product brochure

Any questions?

We look forward to receiving your message or your call.

Jonas Guettel
Product management vibrator technology